top of page

How to integrate your rail network into our rail software

4 Steps to Get Started

Step 1 - Discovery

Engage your stakeholders to develop the use cases and road map. Conduct data and systems analysis to understand your assets and processes.

5-6 weeks 

Step 2 - Pre-Production

This delivers the pre-production version of the platform using an agreed selection of data to enable stakeholders and users to experience the platform. 

5-6 weeks

Step 3 - Implementation

After the agreements made in the previous step, we move to Implementation where we set up the live platform integrating your data into the system.

3-4 months

Step 4 - Go live and supoort

Optimal delivery of services, user acceptance, onboarding, and ongoing training through SaaS subscription after implementation.

3-4 months

Product Packages

Our highly customisable product offers 6 flexible packages to choose from, enabling you to combine features that align with your business needs and objectives.

Foundation

  • Assets overview

  • Track geometry and rail wear

  • TSRs, defects

  • Track section tonnage 

  • Switch movement

  • GPR

  • Live switch monitoring

  • Curve noise

  • GIS map

  • Export data

  • Desktop and mobile application

  • Customer support and services

Enhanced GIS​

  • Decommissioned track

  • Schematic track map 

  • Media evidence from inspection

KPIs​

  • Deviation performance

  • TSRs performance

 Control​ Centre

  • Ticketing

  • Operation process tracking

Predictions

  • Re-rail prediction

  • Tamping prediction

  • Grinding prediction

Foundation

  • Assets overview

  • Track geometry and rail wear

  • TSRs, defects

  • Track section tonnage 

  • Switch movement

  • GPR

  • Live switch monitoring

  • Curve noise

  • GIS map

  • Export data

  • Desktop and mobile application

  • Customer support and services

Asset Overview

Aggregating asset data sets in praedico provides a real-time, single source of truth for smart asset management. It combines live, static, and spatial data to improve asset performance, availability, predictability, and reduce defects and costs.

Asset Overview.jpg
Track geometry and rail wear

Measurements include static measurements, such as asset properties, and dynamic train bound measurements. Measurement systems are integrated with Praedico to display both current and historical measurement data. 

Info Panel.jpg
GIS map

GIS layer options are available on all maps and can be filtered by date and layer attributes (e.g. status, severity, source). Layers include rail type and details (e.g. curve location, steel type), events (e.g. TSRs, defects), measurements (e.g. track geometry and rail wear), ticketing, access points and reference layers. When you select a layer, the view will automatically update. When you select an asset, the map will reload to the location of the asset. 

map clusters.jpg
Tonnage and switch movement

Track section tonnage and switch movement and filter by date range to understand the operational performance of your track and switches with greater context. This data can be used for determining the impact of tonnage, or potential changes in tonnage on network assets to inform maintenance actions and asset management plans.

Tonnage.jpg
Multi Devices

We offer a range of devices to accommodate diverse work requirements.

multi devices.jpg

Enhanced GIS

  • Decommissioned track

  • Schematic track map 

  • Media evidence from inspection

Hi-resolution images

Through enhanced GIS views such as high-res imagery, rail operators can improve safety, reduce costs, and enhance efficiency. For example, they can use real-time data to identify and respond quickly to potential safety hazards, such as track obstructions or train derailments.

High resolution.jpg

KPIs

  • Deviation performance

  • TSRs performance

Deviation performance

Deviation refers to a number of notifications/orders on assets that can lead to either interruption or restriction in the system performance with respect to the level of detail (LOD). It can help asset managers for having a better performance of maintenance plans and fewer disruptions.

Deviation.png
TSR performance

TSR performance dashboard and summary tables, including lost operational time due to TSRs, TSRs grouped by root cause, lifted TSRs per year, and Top 10 TSRs on impact value

TSR.png

 Control​ Centre

  • Ticketing

  • Operation process tracking

Ticketing

Praedico Rail Ticketing improves digital data collection, tracking,

and management. Compare historical data to identify patterns,

trends, and optimisations, identify possible malfunctions before

they happen, and move towards preventative maintenance to

reduce unplanned and unnecessary costs.

Written procedures supplemented with checklists (available in

the app) is proven to reduce human error rates to 1%.

Ticket.png

Prediction

  • Re-rail prediction

  • Tamping prediction

  • Grinding prediction

Re-rail prediction

To set quantitative thresholds for Rail Replacement and eliminate subjectivity from the determination of re-rail locations to ensure the rail condition does not deteriorate beyond operating limits.

Re-rail - Overview.jpg

Let's Get Started!

Thanks for submitting! We will contact you soon.

bottom of page